Ward County authorizes engineering for two township bridge replacements

Feb 4, 2025

The commission approved a proposal and authorized the chair to sign for preliminary environmental and final design engineering work for replacement of Township Bridges #51-135-39.0 (Gassman Coulee) and #51-144-35.0.

The full story

Ward County commissioners approved preliminary environmental documentation and final design engineering services for replacement of two township bridges Feb. 4.

Highway Engineer Dana Larsen presented a proposal from Ackerman Estvold covering environmental documentation and final design for Township Bridge #51-135-39.0 on Gassman Coulee in Burlington Township and Township Bridge #51-144-35.0 from Ackerman Estvold. Commissioner Merritt moved and Commissioner Rostad seconded approval of the proposal and authorized the chairman to sign. The motion passed by unanimous roll-call vote.

The authorization directs county staff to proceed with engineering and environmental steps necessary for bridge replacement design; project schedule, estimated construction costs and funding sources were not specified in the meeting minutes and will be addressed in subsequent engineering work and staff reports.

Written with AI from the event video and transcript. Check it against the source ↓