Designers propose lowering site grade, moving baggage sortation below grade to free terminal space

Oct 16, 2026

The design team proposed shortening the terminal and relocating bag-screening to a walkout basement, which would reduce terminal length, provide additional program space and reduce fill — but the boards must weigh added structural cost versus long-term operational benefit.

The full story

Designers presented a section and master-plan update showing how lowering overall site grade and moving the baggage sortation to an interstitial walkout level could shorten the terminal by up to 60–100 feet and create programmatic efficiencies.