Board approves $65,000 diver cleaning and $5,800 rip‑rap installation by MRI Inspection

May 26, 2026

MRI Inspection LLC proposals to use divers for cleaning blocked structures ($65,000) and to install rip rap at CB‑130 ($5,800) were approved unanimously; the rip rap proposal was corrected to the proper control basin (CB‑130).

The full story

Brenda Radford of MRI Inspection LLC presented two proposals at the May 26 meeting. The Board approved MRI Estimate #6583 for diver cleaning of structures with 25% or greater blockage for $65,000 (motion by Kurt Blumenthal; second by Robert Twombly), and separately approved MRI Estimate #6604 for rip rap installation in control basin CB‑130 in the amount of $5,800 after correcting the location from CB‑139 to CB‑130 (motion by Bob Schultz; second by Robert Twombly).

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in