HDC accepts as-built Confluence pedestrian bridge, requests developers consult earlier on design changes
Oct 13, 2026
The commission acknowledged that the constructed pedestrian bridge connecting the Confluence building to its parking deck differs from earlier schematic renderings but accepted the as-built structure and secured a developer commitment to consult the HDC on future mid-construction design changes.
The full story
The commission reviewed as-built changes to the pedestrian bridge at 185 South 3rd after staff and City Center Group representatives said earlier schematic renderings did not detail the bridge fully. Jane Haft (speaker 15), design director for City Center Group, acknowledged the discrepancy and said trussed steel avoided the need for the tall architectural column shown in schematic renderings. She offered a commitment to improve future communications and suggested working with the artist community on a discreet public-art treatment if warranted.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →