Commission hears proposal for $25,000 engineering study to design Hager flow‑control system
Oct 14, 2026
Oct 14, 2026
Staff described a proposed $25,000 warrant article to fund an engineering and permitting study for a permanent flow‑control device at the Hager property to reduce flood and beaver‑related impacts; commissioners discussed scope and funding options.
The full story
Staff told the commission that Alec and consultant Bill Murray prepared a draft warrant article asking for $25,000 to fund engineering and permitting for a permanent flow‑control device at the Hager property.
