Fall Brook Road Bridge top priority; Wheelock to apply for VTrans Structures grant
Feb 17, 2026
Feb 17, 2026
Selectboard named Fall Brook Road Bridge as the town's top priority for repair; the board will also apply for a VTrans Structures grant (maximum $200,000) due April 15 and will remove Minister Hill Bridge from the CDBG list if VTrans awards funds.
The full story
Selectboard Chair Ann Lawless outlined the town's priority list for resilience work along Millers Run, saying Fall Brook Road Bridge is the top priority because it is the downstream structure most impacted by the same flows that affect upstream sites. She said the twin bridges on Peak Road remain operable but will need maintenance, and that culverts on Vertical Mile Road and Morgan Road East also require hydrology work.
