Board declines motion on $20,900 visualization proposal; members prefer waiting for DRI model

Apr 14, 2026

A $20,900 proposal from Geosystems Analysis Inc to create an animated groundwater-visualization product was discussed; board members questioned redundancy with an upcoming DRI Basin 162 model and took no motion so the item died.

The full story

Staff presented a non-budgeted proposal from Geosystems Analysis Inc to produce a comprehensive visualization package (animation) showing measured groundwater-elevation changes in the Pahrump Valley hydrographic basins using 18+ years of monitoring data. The cost was presented as $20,900.

Board members acknowledged existing slide-based maps created with the Surfer program and noted the Desert Research Institute (DRI) is producing an updated Basin 162 model with outputs expected in roughly 11 months. Several members recommended waiting for the DRI outputs to avoid duplicate expense; others said an interim visualization could help public understanding. No motion was made and the item died, leaving the option to bring a revised proposal back after DRI results are available.

Written with AI from the event video and transcript. Check it against the source ↓