Moreno Outlines Design, Construction Plan for 600-Square-Foot ADU
May 27, 2026
Applicant Christopher Moreno described the accessory unit as having four slanted/shed roof lines, a rear master addition and a front living-room projection, and said he intends to live in the ADU while rebuilding the main house.
The full story
Christopher Moreno, the applicant for administrative permit LU20260065, described the ADUs design and planned construction sequence for the record on May 27, 2026. Moreno said the unit will include multiple slanted rooflines to match the existing house style and that an addition at the rear will contain a master suite.
"So, it's gonna have a bunch of slant roofs similar to that," Moreno said when asked to describe the plans. He added there would be "like 4 separate roof lines, with an addition off of the back for the master, and we're gonna push out the living room in the front," and that the roof details would be shed roofs "3 over 12" to match the aesthetic.
Moreno said he planned to occupy the ADU temporarily while rebuilding the rest of the house and confirmed he had architectural plans available on his phone for review during the hearing. The Hearing Examiner accepted Morenos description as part of the record; no public comments or objections were made.
Written with AI from the event video and transcript. Check it against the source ↓
