MSA presents culvert and ditching options for West Crystal Drive; Board asks for cost comparisons

Dec 10, 2024

MSA project engineer Matt Wathke presented preliminary options for ditching and culvert replacement on West Crystal Drive and was asked to estimate costs for work confined to the Town right-of-way versus work requiring private-property access and to model impacts of a larger culvert.

The full story

MSA project engineer Matt Wathke presented preliminary findings on ditching and potential culvert replacement along West Crystal Drive. Wathke outlined options that prioritize keeping construction within the Town right-of-way to avoid requiring work on private property.