Selectboard backs plan to replace Main Street center main and avoid excavating building loops

Oct 12, 2026

After considering three options for Main Street, the Selectboard directed the engineer to replace the 1905 center main and tie into existing ductile‑iron loops and building services to minimize disruption to businesses; the new main will be 12‑inch to the Bingham residence.

The full story

The Selectboard chose an approach for Main Street that aims to reduce disruption to downtown businesses: the engineer will replace the 1905 center main and tie into the existing ductile‑iron service loops rather than excavating sidewalks and replacing the loops. The decision followed discussion of National Register constraints on the downtown block and Division of Fire Safety permitting requirements that would increase disruption if every building required a 24‑hour fire watch.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in