Damaged 30‑inch storm pipe near River Ridge sinkhole spurs lining and replacement proposals

Oct 27, 2026

An engineering inspection found a gash in a 30" ADS stormwater pipe and CCTV flagged additional breaks. Contractors proposed either a 296‑foot CIPP lining at $83,080 or a full 300‑foot pipe replacement at $86,898; the board was scheduled to consider next steps Oct. 27, 2026.

The full story

An engineering inspection attached to the River Ridge Community Development District packet documented confirmed damage to a 30‑inch corrugated ADS stormwater pipe and recommended exposing a buried manhole to permit a full CCTV review before final repair design.