Bids for Jasper County Community Center electrical-panel replacement range from $22,500 to $52,800

Nov 3, 2026

The Jasper County Board is scheduled to consider multiple vendor estimates for replacing the Community Center's main electrical disconnect and panels at its Nov. 3, 2026 meeting; bids range from $22,500 plus feeder work to $52,800, and vendors list exclusions for permits and metering.

The full story

The Jasper County Board of Supervisors is scheduled to consider three competing estimates to replace the main electrical disconnect and associated panels at the Jasper County Community Center at its Nov. 3, 2026 meeting, scheduled to begin at 9:30 a.m. in the Jasper County Board of Supervisors Room 203. The Buildings and Grounds report supplied three written proposals that differ on scope, price and exclusions.

Buildings and Grounds staff circulated a Team Kline estimate that lists a “Job Total: $52,800.00” for replacing the existing 600A fused disconnect with a new 600A Square D I-Line distribution panel, installing two 200A 72-space panels and repulling or relocating feeders and lighting contactors as needed. Team Kline’s submission notes that pricing "may be subject to change" because of tariffs and supply issues and excludes HVAC control wiring, utility fees, engineering fees and electric metering equipment.

Two lower-cost proposals are also in the packet. Routier Electric provided an estimate of $26,000 that says it will remove the existing disconnect, install a new I-line panel and two 200A bolt‑in panels, re‑pipe existing circuits and perform weekend work; that estimate states it includes labor, materials and inspection permits. Terpstra Plumbing, Heating and Electrical submitted a $22,500 base price for new Square D equipment and lists an additional $6,500 option to replace feeder wire between the main disconnect and the distribution panel; Terpstra’s packet aggregates two project scopes into a combined total of $34,544.30 for both scopes where applicable.

The materials show slightly different assumptions about whether new feeders are needed, whether branch circuits will be reused, and whether certain work (metering, service disconnects, HVAC control wiring) is out of scope and billed separately. Vendors also note practical constraints such as working weekends and the need for supplemental refrigeration during reconnections.

The board packet supplies contact information for the estimators and directs the supervisors to the Buildings and Grounds recommendation for award consideration. The board is scheduled to take up the item at the Nov. 3, 2026 meeting in Room 203.