Commission accepts as-built plans for Protem Cedar Creek Bridge

Mar 31, 2025

Taney County accepted the as-built construction plans for the Protem Cedar Creek Bridge and authorized the presiding commissioner to sign the front page.

The full story

The Taney County Commission voted March 31 to accept the as-built construction plans for the Protem Cedar Creek Bridge (Project #16100797 over Shoal Creek, Section 31). Weston Hanger, civil engineer with Great River Engineering, and Jack Cole, Assistant Road & Bridge Administrator, were present during the item.