County packet asks board to retain engineering consultant for Summit Lake Solar drainage work

Nov 3, 2026

Packet reports the Summit Lake Solar project near Reading will affect county and judicial ditches; drainage counsel recommended hiring an engineering consultant and staff recommend retaining Houston Engineering to review reroute and abandonment plans.

The full story

A department briefing in the Nov. 3, 2026 packet says the Summit Lake Solar project near Reading is expected to affect benefited lands in County Ditch 11 and Judicial Ditches 11B and 8. The packet reports that through the PUC permitting process Geronimo Power engaged with county staff on potential reroute and abandonment plans and that county drainage legal counsel advised the Drainage Authority to hire an engineering consultant to review project specifications.