Cando Rail's Avon operating plan details safety systems, regulatory requirements

Aug 27, 2026

The Cando Rail operating plan submitted to Avon describes a three‑track transload terminal with no fixed on‑site storage, closed‑loop vapor recovery, emergency shutoff valves, and planned compliance with OSHA PSM and EPA RMP requirements. The town received the plan as an attachment to the meeting materials.

The full story

The operating plan submitted by Cando Rail & Terminals (included in the meeting packet) describes an Avon transload terminal at 2861 Lakeville Road that would handle liquefied petroleum gases (propane and butane) and fuel‑grade ethanol without fixed on‑site storage.