Council approves Pecan Ridge site plan and preliminary plat for 4‑building expansion
Jun 8, 2026
After discussion of screening and technical details, council approved the site plan and preliminary plat for a 38.45‑acre Pecan Ridge phase that will add four metal multi‑tenant buildings; the preliminary plat includes a note prohibiting development in the southern floodplain area.
The full story
Council approved the detailed site plan (J‑1) and preliminary plat (J‑2) for the Pecan Ridge plan development, clearing the way for four new multi‑tenant metal buildings on roughly 38.45 acres at 606 US Highway 80. Staff described site improvements including paved interior drives, required dumpster screening, a 50‑foot landscape buffer along US‑80, detention areas and retaining walls to address slope conditions.
Planning staff noted that existing buildings had been grandfathered from certain UDO parking requirements but that the new buildings will comply with current standards. The preliminary plat carries a P&Z condition that development be prohibited and the floodplain not altered within the southern portion (approximately 21 acres) of the tract. Council approved the site plan and the preliminary plat on separate motions; both passed with 5‑0 recorded voice votes.
Written with AI from the event video and transcript. Check it against the source ↓
