Commissioners warn proposed coverage rules could increase impervious surface and runoff
Sep 29, 2026
Sep 29, 2026
A planning commissioner cautioned that proposed lot coverage percentages (commercial 80%, residential 65%) could substantially increase impervious area and stormwater runoff; speakers urged retaining green space and adding mitigation criteria as BMU standards are drafted.
The full story
During the BMU discussion a planning commissioner flagged lot‑coverage figures and stormwater concerns, urging the council to ensure site standards limit impervious surfaces and preserve green space.
