Winhall advances culvert work while deferring three road studies
May 21, 2025
May 21, 2025
Roads employee Trevor Dryden reported two replaced Old Town Road culverts and a grant for French Hollow Road work. The Selectboard deferred three proposed engineering studies over cost while other culvert work and paving bids move forward.
The full story
Winhall has replaced two culverts on Old Town Road and received a grant for culvert replacement on French Hollow Road, Roads employee Trevor Dryden reported to the Selectboard May 21.
