Engineers propose larger tile system for Webster-Calhoun drainage district
Jul 28, 2026
Jul 28, 2026
Agra Via proposed replacing Drainage District No. 12's aging main tile with a larger system designed for 0.5 inch of drainage per day. The proposal remains preliminary, and a landowner questioned whether the broader upgrade would benefit most farms.
The full story
Agra Via outlined a preliminary plan to replace the district-owned tile serving about 1,072 acres in Rowland Township west of Callender, while emphasizing that no decision could be made at the informational meeting. The engineer's report has not been filed, and an official hearing is required before the supervisors and landowners can decide whether to proceed.
