Summary

The board approved issuing a county permit at the water board's request to finalize work the Fugleberg Land Group completed in a County Road 10 ditch; commissioners said the culvert at the location will need replacement and cautioned about applying broad restrictions to culvert work.

Steele County commissioners voted to issue a county-level utility/flow-permit to recognize and finalize drainage work carried out by the Fugleberg Land Group, responding to a request from the local water board.

County and water-board staff reported the North Dakota State Water Commission (the transcript refers to the water board) had recorded a permit for the stream work; the water board asked the commission to issue its own permit so "all the bases are covered." Commissioners agreed to issue the county permit and to provide a signed copy to the water board.

During discussion staff and commissioners described physical problems at the County Road 10 crossing: photos show the culvert at the location has deteriorated, cattails and standing vegetation are blocking flow in places, and the culvert will need to be replaced. County staff said the planned replacement will match the existing diameter and height so it does not change hydraulic capacity; commissioners emphasized that lowering or changing culvert diameter would trigger additional state permitting requirements.

Commissioners also discussed rights-of-way and who would bear the cost of filling and restoring ditch areas where field excavation occurred. Water-board representatives said they had directed landowners to fill certain sections; county staff said they will determine right-of-way lines and whether county payment is required before undertaking corrective work.

The board approved issuing the county permit to finalize the Fugleberg drain work and instructed staff to forward the signed permit to the water board.