Get email alerts on the Infrastructure Water topic
No spam. Unsubscribe anytime.
Council approves MOU with Strand Associates for elevated water tank study
Summary
The council approved a memorandum of understanding with Strand Associates for siting evaluation and a preliminary engineering report for a proposed elevated water tank at $49,500.
Get email alerts on the Infrastructure Water topic
No spam. Unsubscribe anytime.
The Delavan Common Council approved a memorandum of understanding with Strand Associates to conduct a siting evaluation and prepare a preliminary engineering report for a new elevated water tank at a cost of $49,500.
The motion authorizes the city to retain Strand Associates for the preliminary work needed to evaluate potential tank locations and engineering requirements. A second was recorded and the motion passed by the council.
Council members did not record further specifications or a timeline for the study during the meeting; staff follow-up is required to confirm the study scope, deliverables and schedule.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

