Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Commission approves Verizon drawings for Tower 2; discusses lighting opposite side

2303431 · February 13, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Commission approved Verizon’s Tower 2 drawings with staff-requested cabling relocation to the tree-lined side to reduce visibility; commissioners discussed lighting the opposite face of the water tower and asked staff to seek updated cost estimates.

The Cottage Grove Utility Commission on Feb. 12 approved Verizon’s construction drawings for equipment on Tower 2, with staff recommendations to relocate visible cabling to the tower face with more tree screening.

Utility Department staff described that Verizon’s original drawings routed cabling on the west side of Tower 2, which is visible to traffic on County Highway N, and said they requested moving the…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans