Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Commission backs Pontiac Trail reconstruction with sidewalks on both sides; members urge tree-minimizing design
Summary
The Transportation Commission recommended Option 1 for the Pontiac Trail, Boston Court, Nokomis Court and Rosewood Circle reconstruction project — a full reconstruction with sidewalks on both sides — and asked staff to minimize tree removals during detailed design.
The Transportation Commission on Oct. 22 recommended approval of Option 1 for the Pontiac Trail neighborhood reconstruction project, endorsing a full-street rebuild that includes sidewalks on both sides of the roadway and design elements intended to slow traffic.
Mario, the project presenter, described the street as a narrow existing pavement with low parking utilization and said the two draft cross-section options considered differed mainly by whether on-street parking is retained. Option 1 would retain parking and build a 24-foot travelway with sidewalks both sides; Option 2 removes parking for a 22-foot travelway and wider terrace space. Mario said his analysis estimated roughly a dozen tree removals under the 24-foot option but emphasized the numbers were conservative and subject to refinement in design. He…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

