Summary
APASA staff reported seven ITQ items: four from Domi (including Andover Terrace remediation and East Ohio street safety/streetscaping) and three DPW change orders for Lincoln Place; staff supplied project costs and MWBE participation percentages.
APASA provided an update on seven Invitation‑to‑Qualify (ITQ) contract actions during the meeting.
Key items summarized by staff - Andover Terrace slide remediation (phase 2), prime: Ground Technology; total project cost reported as $99,418; subcontractor mix included a veteran‑owned firm and a WBE. - Lincoln Place combined fire & EMS station design change orders (three items), primes and subconsultants included Langan Engineering (environmental/geotechnical); change orders reported at $79,000, $19,000 and $84,001.20 with noted subconsultant shares. - PJ McArdle roadway retaining walls inspection work, prime: SAI Consulting Engineers; project cost $44,101 with a named MBE subconsultant receiving $8,904. - East Ohio Street safety and streetscaping, prime: Traffic Planning and Design; total project cost $546,005.45 and reported approximately 31.1% MWBE participation across four subconsultants (three MWBEs among four subs listed: Larson Design Group, Scitech, Lexus Group, Azalea Group). - Emerald View landslide geotechnical evaluation and alternatives report, prime: SAI Consulting; project cost $188,911 with multiple MWBE subconsultants; staff reported roughly 36.6% MWBE participation on that package.
Staff closed the update by thanking commissioners and noting where MWBE shares were present in the packages. No motions were required for the informational update items.
Ending: Commissioners did not move these ITQ summaries to separate motions during the meeting; staff will continue to provide package details in future updates.