Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Land Use topic
No spam. Unsubscribe anytime.
Planning commission approves two oversized-structure conditional use permits
Summary
The commission approved conditional use permits for oversized accessory structures for applicants Tanner Schmidt and Jacob Johnson, both described as personal storage/workshop uses; staff confirmed setbacks and utilities concerns were addressed.
Get email alerts on the Land Use topic
No spam. Unsubscribe anytime.
The Hooper City Planning Commission approved conditional use permits for two oversized accessory structures at addresses listed in the meeting packet, finding both proposals met applicable setback and height standards under the city’s current code.
Staff highlighted that the first application, from Tanner Schmidt, requested a total of 3,720 square feet (including an awning correction noted in the application packet). Staff said the structure will be used for personal storage, will include electricity and a water line but no sewer, and will meet required setbacks. Schmidt told the commission the space is for “personal storage” and not for a business.
The second approval was for Jacob Johnson, who sought an approximately 3,200-square-foot oversized structure for storage and a workshop. Staff said the proposed building met the RO-zone setbacks (20-foot rear, 10-foot side) and was under the 25-foot height threshold; the applicant said the building was intended to clean up yard storage and provide a workshop space.
In both cases, the commission took public testimony (no members of the public spoke against either application) and then moved to approve the permits. Motions were made and seconded; the chair called for votes, and multiple “Aye” responses were recorded and the motions were announced as passed. The transcript records the motions and approvals but does not contain a named roll-call tally for each vote; the official minutes will contain the formal vote record.
Why it matters: Conditional use permits for oversized accessory structures change what property owners may build and where; approvals set precedents for setback and utility conditions planners will apply to similar future requests.
Next steps: Staff will finalize permit paperwork and proceed with building-permit reviews and inspections as required. The commission noted plumbing-related considerations for sewer connections when plumbing is proposed in accessory structures.

