Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Setbacks topic

No spam. Unsubscribe anytime.

Resident seeks variance for carport; commission outlines setback and outbuilding rules

Fielding Town Planning Commission · October 2, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

A resident asked the Fielding Town Planning Commission whether a 24-by-20 carport would require a building permit and whether it could be sited inside a 35-foot front setback. Commissioners explained the permit and variance process, confirmed a 35-foot front setback figure, and clarified outbuilding drip-edge and interior-side/rear setback rules.

A Fielding resident asked the Planning Commission whether a proposed 24-by-20 carport would require a building permit and whether it could be sited within the town’s 35-foot front setback.

Commission staff and members told the resident that a structure of the size described will require a building permit and that situating the carport at about 31 feet from the road would put it inside the front setback and therefore would require the applicant to seek a variance and be placed on a future agenda. “So it will end up being 4 or 5 feet closer to the road,” the resident said; commission members confirmed the 35-foot front setback and explained the variance process and agenda scheduling.

The commission also clarified rules for outbuildings and the “drip edge.” A member explained the town ordinance requires that snow or runoff from roofs land on the property owner’s lot (the ordinance language was referenced but not cited by number). For non-street sides, commissioners said outbuildings can be as close as 1 foot from the property line; the main building, by contrast, has a larger setback requirement (discussed as 15 feet in the meeting). The commission advised that the applicant’s drip edge must fall on the applicant’s property: “if snow was coming off, it has to be landing on your property. It can't be landing on your neighbor's property.”

Next steps: Commissioners advised the resident they would put the variance/request on the next meeting agenda so the applicant can submit formal plans and that a special meeting could be called only in urgent circumstances. The resident was told to expect to obtain a formal survey/plan and to return with the item on the next agenda.

No formal vote was recorded on the setback questions; the items were procedural and resulted in scheduling the resident for a future agenda.