County engineer proposes precast concrete guardrail replacement as a permanent fix for bridge damage
Aug 19, 2024
County staff proposed replacing metal guardrail with precast concrete barriers on the South Bridge and widening shoulders to reduce recurring repair costs; estimated cost for the section was between $60,000 and $80,000 and commissioners discussed moving forward.
The full story
County road staff updated commissioners on paving and maintenance work and proposed replacing the frequently damaged metal guardrail on the South Bridge with precast concrete barrier segments. S6 argued the current metal posts and knuckles are repeatedly damaged and costly to repair and described a plan to widen shoulders and install interlocking precast concrete units that would be more durable.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
