Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Zoning board approves attached carport and bulk variances at flood‑impacted 77 West End Ave

City of Summit Zoning Board of Adjustment · December 3, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved side‑yard and total side‑yard variances for 77 West End Ave, allowing an attached carport (open on three sides) and related bulk relief after the applicant said the design avoids a time‑consuming state flood permit and includes drainage measures (interceptor trench and underground storage) to capture new runoff.

The Summit Zoning Board on Dec. 2 approved bulk and setback variances for 77 West End Ave that permit an attached carport tied to the principal structure and related side‑yard relief. The applicants reduced the scope of new enclosed building area in the flood‑impacted portion of the lot and proposed a carport and stormwater measures intended to avoid an individual State DEP flood hazard permit, which would require months of hydraulic modeling.

Key techni…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans