Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Engineers present accessible 2,000‑sq‑ft stage plan for Talleyrand Park

Bellefonte Borough Council · December 16, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Keller Engineers outlined a 2,000 sq ft stage at Talleyrand Park that includes an elevated, flood‑compliant slab foundation, reconstructed ADA parking stalls and a pedestrian walkway; the plan is ready for formal land‑development review after design in January.

Michael Pratt of Keller Engineers presented a concept plan for a 2,000‑square‑foot stage at Talleyrand Park, saying the structure would host music, dance and theatrical events and connect to the park's south parking lot by an asphalt pedestrian walkway. Pratt said the design includes an elevated slab‑on‑grade foundation with frost walls, masonry and stone exterior treatments, and a standing‑seam metal roof.

Pratt told council the project will require borough council approval, a conservation district erosion and…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans