Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Accessibility Addition topic

No spam. Unsubscribe anytime.

Panel approves rear-yard variance for accessibility addition at 535 Humboldt Court

Gahanna Planning Commission · December 4, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Gahanna planning commissioners approved variance V-31-2025 allowing a 1,192 sq ft addition at 535 Humboldt Court that encroaches 7 feet into the 25-foot rear-yard setback; applicant cited mobility needs, and staff recommended approval citing easements and site constraints.

The Gahanna Planning Commission on Dec. 3 approved variance V-31-2025 for a 1,192-square-foot addition at 535 Humboldt Court that will sit 18 feet 1 inch from the south property line, encroaching roughly 7 feet into the 25-foot rear-yard requirement for R-3 small-lot residential properties.

Staff told the commission that an adjacent, city-owned conservation parcel and existing trees provide screening and that easements and house orientation limit viable locations for an addition. Staff recommended approval based on limited relocation options and alignment with variance criteria.

Homeowner Steve Benninger said the addition is driven by accessibility needs: his wife uses a prosthesis and climbing stairs to the bedroom has become difficult. "She's worn a prosthesis for nearly 60 years," Benninger said, explaining that the new main-level living space would reduce daily hardship.

Rand Golvis, the project’s electrical engineer, testified that the new addition would be built over the existing electrical service and that American Electric Power requires conduit routing around the east side of the addition, constraining eastward movement of the building footprint.

Commissioners asked about drainage (an existing swale), materials (siding to match existing vinyl and brick accents), and the building-permit process. Laser moved to approve the variance; Siriano seconded. Commissioners highlighted the nature preserve behind the property and agreed the plan met necessity criteria; the motion carried on roll call.

Next steps: applicant to resolve staff comments; building-permit issuance will be handled by the building division following administrative review.