Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Av Entus Mixed Use topic

No spam. Unsubscribe anytime.

Commission approves Aventus final site plan for mixed‑use project near Bash Parkway

Hurricane City Planning Commission · October 23, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The planning commission approved the final site plan for Aventus, a three‑building mixed‑use project that the agent said will include roughly 40 residential units plus hotel units and ground‑floor commercial space; approval was conditioned on staff and JUC comments.

The Hurricane City Planning Commission voted Oct. 23 to approve FSP25‑34, the Aventus final site plan, advancing a mixed‑use project at the southeast corner of Bash Parkway and Sand Hollow.

Agent Carl Rasmussen described three buildings with a mix of commercial space, residential units and a hotel component. Rasmussen said the project contains roughly "40 residential units" alongside numerous hotel‑style units and rooftop amenities. Staff told the commission they had received the construction drawings, use percentages and a parking study and recommended approval subject to staff and joint‑use committee comments.

Commissioners complimented the proposed architecture and discussed stormwater detention and landscaping details; staff noted the project includes a detention basin that will feed irrigation systems and downstream ponds. The commission approved the final site plan by motion and voice vote, with the unanimous caveat that the applicant address outstanding engineering and JUC items before building permits are issued.

Next steps include final engineering sign‑offs and submitted construction documents required for permitting; staff will monitor parking, circulation and landscape plan conformance before issuing permits.