Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Board approves two tie‑pole variances for dock at 1982 West Vina Del Mar Blvd

Board of Adjustment, City of St. Pete Beach · January 29, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After technical testimony about wake and mooring safety, the board approved two tie‑pole variances to allow a wet slip tide‑pole configuration at 1982 West Vina Del Mar Boulevard, subject to conditions including an as‑built survey and limits tied to the submitted plan.

The St. Pete Beach Board of Adjustment approved a limited variance allowing two tie poles at 1982 West Vina Del Mar Boulevard to create a wet slip suitable for a 30‑foot sailboat. The approval was conditioned on the slip being installed only as depicted in the submitted dock plan and on providing a final as‑built survey verifying dimensions.

Owners Scott and Katie Sullivan, who have owned the property since 2019, said the request is narrowly tailored: they are not asking to extend the dock or add a lift; they seek two outside tie poles so the boat can be secured with…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans