Citizen Portal

Get email alerts on the Weber Ridge 2 topic

No spam. Unsubscribe anytime.

Weber Ridge 2 amendment found complete; plans to be signed

Planning Board · February 24, 2025

Summary

The Planning Board found the Weber Ridge 2 subdivision amendment (Lots 2 and 3 septic/well changes) complete, approved required determinations and agreed to sign plans; the applicant will provide the signed set and staff will file findings.

Ranger Christensen of South Coast Construction presented a subdivision amendment for Weber Ridge 2 on Feb. 24 that addresses relocation of a separate system for Lot 3 and changes to Lot 2, including septic design updates and well encasement requirements.

Staff reported the submitted septic designs for Lots 2 and 3 meet the limiting‑factor and 100‑foot exclusion‑zone requirements; a test fit was provided for Lot 2. The board voted to find the application complete, instructed staff to sign the plans and to find the facts at the end of the meeting. The motions carried unanimously.

The applicant will submit final signed plans for town signatures; staff indicated one full set was available for signing that night and the remaining set would be emailed for in‑office signature.

The board’s determinations focused on code conformance for septic systems, no‑cut buffer signage continuing between Lots 2 and 3, and encasing the Lot 3 well to bedrock due to proximity to the road.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source