Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure topic

No spam. Unsubscribe anytime.

Council approves engineering study for Old Settlers Boulevard bridge

Round Rock City Council · February 26, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Round Rock authorized a $129,000 engineering contract with HDR to evaluate and design repairs for a 40-year-old bridge on Old Settlers Boulevard after TxDOT inspections identified cracking, spalling and failing expansion-joint components.

The council approved a resolution authorizing HDR Engineering to perform an engineering study and develop designs for repairs to a bridge on Old Settlers Boulevard, a structure built in 1986 that staff said shows cracking, spalling and issues with expansion joints and metal brace components.

City staff said TxDOT inspects local bridges biennially and forwards reports; jurisdictions that own bridges are responsible for repairs. Staff described the bridge defects, the potential influence of a right-turn lane installed for a nearby apartment complex and the need to produce plans so repairs can proceed.

The proposed engineering contract amount presented to council was $129,000. Council approved the authorization and staff said they will return with plans and recommendations for repair work and associated procurement.