Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Commissioners approve work change directive and note large Rattlesnake Water System charges
Summary
Fayette County commissioners authorized a change directive for the Rattlesnake Water Treatment Plant that upgrades a pump and control panel, and the minutes show substantial contract payments to Rattlesnake Water System vendors and engineers.
The Fayette County Board of Commissioners on Feb. 17 authorized Work Change Directive No. 1 for Contract A at the Rattlesnake Water Treatment Plant to modify the recarb system and update pump controls.
The directive, approved by motion and unanimous roll call, directs replacement of an existing Franklin Electric pump with a configuration supporting a 5-horsepower variable-frequency drive and replacement of the Eaton AN19BN0A5E020 control panel with an ABB 240-volt, single-phase drive. The record lists the change-directive line item as…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat
