Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Engineering plan for Clear Pond Park proposes new snack building, ADA upgrades, parking and drainage fixes

Lakeville Parks Commission · March 13, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Zenith Engineering presented a plan to reorganize Clear Pond Park with 104 parking spaces, ADA seating areas at fields, a proposed 30x50 multi‑use building, drainage basins to reduce persistent field flooding, replacement of an undersized culvert and a 2,500‑gallon tight tank for utilities.

Zenith Engineering presented its site and technical plans for park improvements to the Parks Commission on March 12, emphasizing parking organization, accessibility upgrades and a multi‑tier drainage solution intended to fix chronically wet fields.

Jamie of Zenith Engineering said the layout calls for 104 parking spaces (including five accessible spaces and four van‑accessible stalls) and a gravel paving delineation with curb stops to create durable parking stalls. "We're proposing that for delineations here," Jamie told the commission while describing a buried paving block approach to keep stall markers visible through plowing and grading.

The plan proposes a new 30‑by‑50‑foot building to house a snack shack, bathrooms and storage; Jamie noted the dimensions were a placeholder pending structural…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans