Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

County hears road‑work schedule, hard‑surface evaluation RFP results and pushes site review for speed reduction

Montezuma County Board of County Commissioners · March 16, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

County staff outlined summer road projects (Cottonwood Road resurfacing and bridge replacement June 8–19), district material needs (~30,000 tons total), a recommended vendor for a hard‑surface evaluation, and asked staff to study lowering speeds on a short section near County Road G and report back with MUTCD guidance and enforcement input.

County staff briefed commissioners on multiple transportation items affecting summer travel and maintenance.

A Forest Service representative described a Cottonwood Road project expected to close the road for construction June 8–19 for resurfacing and a bridge replacement; the project will widen some curves to accommodate log trucks and improve drainage and historic stone culverts. Staff warned that localized traffic holds could occur during construction but said delays should generally be limited to about 15 minutes.

On county operations, staff compiled district material needs for…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans