Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Congestion Management topic

No spam. Unsubscribe anytime.

Board approves US‑1 congestion study scope to explore safety and multimodal options

Martin County Metropolitan Planning Organization Board · May 11, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The MPO approved a congestion management study for US‑1 (SW Joan Jefferson Way to SE Lillian Court) to analyze travel time, transit, bike/pedestrian safety and operational strategies; consultant outreach and striping/protected bike lanes are among proposed options.

The Martin County MPO on May 11 approved the scope of a congestion management study for a segment of US‑1 extending from southwest Joan Jefferson Way to the St. Lucy County line (just south of Cove Road to SE Lillian Court).

Consultant Bonnie (teaming with Kimley‑Horn) told the board the study will collect travel‑time and speed data, evaluate transit routing, analyze bicycle and pedestrian safety, conduct outreach including an open house and online survey, and develop strategies ranging from signal timing and striping to protected bike lanes. The study is a phase two continuation of a prior US‑1 project north of the Roosevelt Bridge.

The scope includes both capital and operational options; an estimated consultant engagement of about $55,000 was cited to cover outreach and engineering. Commissioners asked about coordination with neighboring St. Lucy County and the City of Stewart; staff said the project will coordinate with the city and advisory committees. The motion to approve the scope passed with Commissioner Reid recorded as voting no.

The study will feed into the TIP and future programming decisions; staff will return with more details on outreach and schedule.