Get email alerts on the Facilities Hvac topic
No spam. Unsubscribe anytime.
Board authorizes $194,480 library HVAC controls upgrade with ControlNet
Summary
Trustees authorized ControlNet to replace controllers and integrate the library into the township HVAC control system for $176,800 plus 10% contingency ($194,480), funded from account #27790-97106.
Get email alerts on the Facilities Hvac topic
No spam. Unsubscribe anytime.
Waterford Township on March 9 approved a project to replace outdated HVAC controllers at the township library and integrate the building into the township-wide HVAC control system.
DPW Director Justin Westlake explained the library uses four rooftop air handlers, 32 VAV boxes and two boilers controlled by legacy controllers and software. The Board approved single-source vendor ControlNet to supply and install replacement controllers and update the control interface for a base price of $176,800 plus a 10% contingency of $17,680, for a total not to exceed $194,480 to be charged to account #27790-97106. ControlNet is the township’s single-source vendor for the control system and is already used at other facilities.
What’s next: DPW will schedule installation and integrate the library into the centralized control system, enabling remote adjustments and reduced manual facility visits.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
