Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Infrastructure topic
No spam. Unsubscribe anytime.
Supervisors discuss solid-waste operations, electronics recycling and road projects
Summary
Supervisors reviewed solid-waste transfer-station funding, electronics-recycling volumes and upcoming road and bridge work, and considered testing a topical road-stabilization product on a trial stretch.
Get email alerts on the Infrastructure topic
No spam. Unsubscribe anytime.
Crawford County supervisors used part of their May 19 meeting to review solid-waste operations, recycling metrics and several transportation projects.
S1 and S3 described efforts to renew a dedicated fund for the county’s solid-waste transfer station to simplify audits and ensure funds are available if the transfer station closes temporarily. S1 said the board would obtain quotes to repair roofs on storage buildings (estimate roughly $10,000) rather than replace structures.
Electronic recycling drew attention: S1 reported that in 2025 the county recycled about "35,000 pounds of TVs and computer monitors," and supervisors compared local fees to Carroll County’s posted $22.50 per TV/tablet/laptop/monitor. Board members discussed coordination with vendor pickups and whether the program yields net revenue or a cost-neutral outcome for the county.
On transportation, supervisors discussed the L51 project schedule and DOT calibration of plant equipment, bridge crew progress on a street bridge repair, and selected sites for possible pipe-liner testing. Supervisors also debated a vendor demonstration of a topical road-stabilization (dust-control/stabilizer) product and whether to allow a free trial quarter-mile test section — including concerns about road closures and traffic disruption during curing.
Attribution: Program statistics were presented by supervisors during the weekly reports; road project details were supplied by staff and supervisors referencing DOT contacts.
Next steps: staff to obtain roof quotes, follow-up with DOT on plant calibration and provide recommendations on a road-stabilizer trial location.

