APC staff describes conceptual Northern Corridor Connection; INDOT has not committed
Mar 11, 2026
APC staff said the Northern Corridor Connection is a locally controlled, conceptual connector beginning at the US 231 terminus; staff described an anticipated arterial four-lane design, three study phases, funding and jurisdictional coordination challenges, and industrial traffic drivers such as SK Hynix.
The full story
Tim Stroshine, APC staff, updated the Area Plan Commission of Tippecanoe County Citizen Participation Committee on March 11 about the Northern Corridor Connection, which he described as a conceptual, locally controlled connector beginning at the existing terminus of U.S. 231.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
or
