Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Drive Through Site Plan topic

No spam. Unsubscribe anytime.

Developer and landlord present Grater’s drive‑through options; commissioners seek operational data before deciding

New Albany Planning Commission · April 21, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

During Other Business the applicant presented revised site concepts for a Grater’s drive‑through; landlord and commissioners discussed stacking capacity, ingress/egress, and mitigation (signage, striping and limiting ingress from private roads). Staff asked the applicant to return with operational data and refined plans.

At the April 21 Planning Commission meeting, the applicant and landlord presented revised circulation options for a proposed Grater’s drive‑through at a mixed‑use center near Smith Mill Road. The concept aims to keep drive‑through stacking internal to the private lot and avoid overflow into Woodcrest Way or public right‑of‑way.

Applicant and landlord representatives explained two circulation alternatives: (1) a loop that routes vehicles into a stacking lane away from the public drive aisles, and (2) a split approach that uses an alternative drive aisle for overflow stacking with signage and striping to guide circulation. The landlord stressed that the center’s daytime tenants are primarily medical or professional offices with peak use during business hours, whereas Grater’s peak demand occurs in the evening and after school — a pattern that could minimize conflict between tenant parking and drive‑through stacking.

Commissioners and staff raised operational questions: how many stacking positions Grater’s actually needs at peak, whether striping or signage would be visible from the public signal, whether limiting ingress from Woodcrest would reduce conflicts, and whether circular routing would require sacrifice of parking stalls. Engineering and staff suggested applicant operations data (peak hourly stacking counts) and that Grater’s operations staff meet with planning and engineering to refine a circulation plan. The applicant said operators have been asked to provide that data and that the team would return with a revised concept that integrates signage, striping and potential ingress restrictions.

The commission did not vote on the concept tonight; staff and the applicant will continue to refine the plan and bring operational data for an informed conditional‑use or design review later.