Resident urges River Ridge CDD to address persistent flooding at Pinehurst monument
Jul 23, 2024
At the July 23 meeting, resident Shari Perkins told the River Ridge Board that plugged drains and a malfunctioning retention pond near Pinehurst are causing ponding and potential flooding; the board directed the district engineer to inspect and asked Perkins to provide photos and video evidence.
The full story
Resident Shari Perkins told the River Ridge Community Development District board on July 23 that, a week after a plugged street drain, water was still overflowing in the triangle monument area at Pinehurst and that a retention pond between River 8 and River 9 appeared to be nearly 1 foot above the drain and non-functional.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →