Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Lake Maintenance topic

No spam. Unsubscribe anytime.

Premier Lakes reports maintenance progress; board to explore moving compressor after sound concerns

River Ridge Community Development District Board of Supervisors · July 23, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Premier Lakes told the River Ridge CDD that lake and dry retention areas are generally in good shape though seasonal algae was noted; a cabinet reduced compressor noise at Masters Lake from 64 to 52 decibels but staff said the aerator’s tone remains an issue and will evaluate relocating the compressor.

Premier Lakes representative Bill Kurth reported that the community’s lakes, preserves and dry retention areas are in good condition overall but that seasonal algae growth had been observed and scheduled plantings are planned.

Kurth said a cabinet installed around the Masters Lake compressor reduced the measured sound level from 64 to 52 decibels and described that reduction as acceptable given the location between the compressor and the screen line. Operations Manager Shane Willis cautioned, however, that “the issue is not so much about the decibels but it is the tone of the aerator,” and recommended evaluating moving the compressor to further address the nuisance sound.

Board members discussed potential easement and rip-rap work to address flooding observed in Edgewater, and Chair Bob Schultz recommended meeting with an Edgewater association representative to reach an acceptable solution. The Board reached consensus to delay planting in Lake E4-A and to avoid Canna lilies until an agreement with the Edgewater Association is reached. Mr. Willis and Premier Lakes will coordinate on compressor location and report back at the next meeting.