Twin Lakes board selects $8,700 rolled curb replacement after split vote

Jan 21, 2025

The Twin Lakes board voted 6–1 to approve a more durable rolled‑curb replacement at $8,700 after rejecting a lower‑cost $2,600 extruded curb option by the same margin; the board discussed vendor availability and repair timelines in common‑grounds reports.

The full story

During common‑grounds discussion the board addressed damaged curbing in a Division 6 cul‑de‑sac and considered two repair options: a lower‑cost $2,600 extruded curb and a more durable $8,700 rolled curb. Tom Brunner proposed and Craig Brown seconded separate votes on each option.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in