Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Sewer topic

No spam. Unsubscribe anytime.

DNR inspection requires Boxholm to submit plan to replace sewer operator

Boxholm City Council · February 1, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

At its Oct. 10, 2024 meeting the Boxholm City Council recorded receipt of a DNR inspection report that requires the council to submit a plan to replace the Sewer Operator and recommends removing burrowing animals at the lagoon and addressing inflow/infiltration in the collection system.

At its Oct. 10, 2024 meeting, the Boxholm City Council recorded that the DNR submitted an inspection report requiring the city to submit a plan for replacing the Sewer Operator.

The minutes state the DNR also recommended removing burrowing animals at the lagoon and eliminating sources of inflow and infiltration (I/I) within the collection system. The council did not record a formal vote on the DNR report in the minutes.

The inspection directive triggers a compliance obligation for the city; the minutes do not specify who will prepare the required replacement plan or a deadline for submission. The council’s minutes note the DNR’s recommendations but do not record further technical detail, cost estimates or a timeline for implementing animal-control or I/I mitigation steps.

The council’s minutes show this item as an administrative matter arising during the regular meeting; the next procedural step recorded is the requirement to submit the plan to the DNR, with no motion or assignment recorded in the minutes about who will draft the plan.