River Ridge board hears lake maintenance update; compressor noise reduced but tone remains a concern

Jul 23, 2024

Premier Lakes reported algae as a routine seasonal issue, said a compressor cabinet reduced measured noise at Masters Lake from 64 to 52 decibels, and the board delayed plantings at Lake E4-A pending agreement with the Edgewater Condo Association.

The full story

At the July 23 meeting, Premier Lakes representative Bill Kurth told the River Ridge Board that lakes, preserves and dry retention areas are generally in good shape though seasonal algae growth was noted. He said a cabinet installed around a compressor at Masters Lake reduced the measured sound level from 64 to 52 decibels.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in