Residents report persistent drainage and ponding in Pinehurst; engineer to inspect
Jul 23, 2024
Jul 23, 2024
Residents told the River Ridge board that drains plugged last week have not fixed flooding near the Pinehurst monument and a retention pond between River 8 and River 9 is nearly a foot above the drain; the board directed the district engineer to inspect and asked residents to provide photos or video.
The full story
At a July 23 meeting of the River Ridge Community Development District, residents urged the board to address ongoing drainage problems near the Pinehurst monument and a nearby retention pond that is pooling nearly a foot above its drain.
