Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Emergency Services topic

No spam. Unsubscribe anytime.

Board approves $19,600 electrical assessment for EMS station generator upgrades

Nelson County Board of Supervisors · July 15, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved resolution R2026-60 to fund an electrical-engineering assessment and remediation proposal ($19,600) for generator replacements and associated technical documentation at county EMS and volunteer fire sites, with possible FEMA grant support.

The Board of Supervisors approved a $19,600 electrical-engineering assessment and remediation proposal to evaluate and size replacement generators, transfer switches and related circuit work for multiple EMS and volunteer fire sites across the county.

Scope and purpose: Staff described the consultant deliverables: stamped as-built and construction drawings, load and short-circuit analyses, transfer-switch evaluations, conductor-sizing reviews with upsizing recommendations, load-shedding logic where needed, run-time analyses at multiple load levels, and documentation to support potential FEMA grant funding.

Board action: After a motion and second, the board conducted a roll-call vote and approved resolution R2026-60. The recorded roll call in the meeting minutes was: Mister Rutherford—Yes; Mister Vander Meade—Yes; Mister Reed—Yes; Mister Barr—Yes; Doctor [name called]—Yes.

Follow-up: Staff noted FEMA may eventually cover some costs; staff will proceed with the assessment and return with findings and recommendations for any required remediation or grant applications.