Residents raise flooding concerns at Pinehurst monument; engineer to inspect

Jul 23, 2024

Resident Shari Perkins told the River Ridge board that drains plugged last week have left water overflowing at the Pinehurst monument and that a nearby retention pond is nearly 1 foot above its drain; District Engineer John Baker said the inlet was plugged and further study and photos/video are needed and the engineer will inspect the site.

The full story

Resident Shari Perkins told the River Ridge Community Development District board on July 23 that, a week after a street drain was plugged, drainage problems persist and water has been overflowing in the triangle monument area near Pinehurst.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in